Design and Construction of
the New Generator
Transformer Plinths for Unit
3 and 5 Contract
No.RTO/ 414459
Design of new transformer plinths; Preparation of architectural drawings,
Conducting of geotechnical investigations, and Structural designs of the plinths.
Construction of the new transformer plinths; Demolition of the old transformer plinths,
Removal and disposal of resulting debris, Cleaning of excavated pits for new transformer plinths,
Cutting, bending and fixing or reinforcement bars, Shuttering for sides of transformer bases,
plinths and bund walls, and Concrete for base, plinths and bund walls.
Newly constructed transformer plinth
Newly constructed transformer plinth
Galvanized steel grating placed on the new plinth
Galvanized steel grating placed on the new plinth
Placing transformer on plinth
Placing transformer on plinth
Transformer placed on the newly constructed plinth
Transformer placed on the newly constructed plinth